1987 | June | Company established in 5-8 Akihabara, Taito-ku, Tokyo , with authorized capital of 320 million yen and paid-in capital of 80 million yen. Company name is "AIREC Corporation" |
---|---|---|
July | Established the Tsukuba Technical center (Tsukuba city, Ibaraki prefecture). | |
October | Established Chiba equipment centers (Chiba city, Chiba prefecture). |
|
1988 | July | Established Osaka sales office (Itami city, Hyogo prefecture). |
August | Authorized capital was increased to 1.280 million yen, paid-in capital is increased to 320 million yen Changed the name to "AIREC Engineering Corporation" |
|
1990 | April | Established Kyushu sales office (Kumamoto city, Kumamoto Prefecture). |
June | Moved to Osaka sales office to Osaka city, Osaka prefecture |
|
November | Get the Minister of Construction construction permit (specific construction). | |
1991 | March | Started receiving subcontract for trenchless pipe line design |
June | Started manufacturing and sales civil engineering material beginning with the PMF. |
|
June | Reorganized Osaka sales office into Kansai branch office | |
November | Ace Mole method won the ISTT (International Trenchless Technology Association) NO-DIG Award. | |
1992 | January | Established Kyoto technology centers ( Kyotanabe city, Kyoto prefecture). |
March | Employed small section shield machine M2-1200 to public sewer construction work. |
|
May | Initiated the establishment of Ace Mole technique association. Was appointed the head secretariat company. The office was located in the company's head office. 67 member company. | |
May | Established Tokai sales office (Nagoya city, Aichi prefecture). | |
June | Established Tohoku sales office (Sendai city, Miyagi prefecture). | |
July | Separated Tokyo sales office and Kanto sales office from head office. | |
December | Registered as construction consultant (tunnel sector) | |
1993 | March | Ace Mole is adopted in the public sewer construction work. |
April | Achieved the maximum piping of 132m / span by Ace Mole PC10 in Tochigi Prefecture Mibu town. |
|
September | Mini Espar passed Ministry of Construction's technology evaluation system, won the evaluation award Successful experimented hume pipe's curve piping by Ace Mole. |
|
October | Ace Mole DL35/50 achieved the maximum piping of 285m /span in Sendai city, Miyagi prefecture. | |
December | Reorganized the Tokyo, Kanto, Tohoku, Tokai, Kyushu sales office to branches. | |
1994 | March | For the first time in the world pipe jacki the sewer small-diameter curved hume pipe by Ace Mole |
March | Started the leasing business of large turning boring machine. |
|
April | Started ground exploration business using the elastic wave. | |
April | Ace PL30 achieved the longest piping of 498m /span in Sendai city, Miyagi prefecture. | |
May | Moved head office to 3-18-10 Motoasakusa Taito-ku,Tokyo | |
May | Established Chukoku branch (Hiroshima city Hiroshima prefecture) | |
September | The trenchless technology by Ace Mole, Espar was awarded the recognizing award from Construction Industrial Accident Prevention Association | |
December | Ace Mole achieved the record of 300km. | |
1995 | March | Ace Mole DL50 succeeded in pipe jacking the R = 76m steep curve pipe in Kashiwa city, Chiba prefecture. |
April | Established Shikoku branch (Matsuyama city, Ehime prefecture). |
|
May | Established Hokkaido branch (Sapporo city, Hokkaido). | |
June | Start design business for electrical wire joint groove. | |
1996 | April | Initiated the establishment of Espar exploration Association. Airec's president was appointed chairman. The office located in company's head office. 40 member company. |
October | Registered as construction consultant (road sector). | |
November | Start leasing Handy Espar. | |
1997 | August | Registered surveying business. |
1998 | February | Ace Mole achieved the piping record of 500km. |
April | Started selling mud material Surura G. | |
August | Established East-West Sales Division. | |
December | Ace Mole DL50 achieved the maximum piping of 289m / span in Awaji town, Hyogo prefecture. | |
1999 | February | Ace mole DL50 succeeded in pipe jacking R = 120m S curve pipe in Cobblestone mixed sandy gravel layer in Kumamoto city, Kumamoto prefecture. |
February | Ace Mole DL50 succeeded in jacking R = 200mS-curve pipe in gravel mixed silt layer of Nishinomiya city, Hyogo prefecture. |
|
August | Succeeded in water purification of the pond in Koko-en Garden Himeji city, Hyogo prefecture using Turbid water treatment equipment "WATS". | |
2000 | May | Won Technology Award by the Japan Society of Civil Engineers Kansai Branch (Using Espar in large-scale hindrance transfering work "the path of the multi-media ") |
June | Ace Mole DL50 succeeded in jacking R = 55m steep curve pipe in gravel soil in Kyoto city, Kyoto prefecture. | |
October | Ace Mole method won the ISTT 's (International Trenchless Technology Association) NO-DIG special award. | |
October | The DL50 compact Ace Mole succeeded in pipe jacking in the boulder-mixed silt layer of Kumamoto Prefecture Uto city. | |
2001 | February | Ace Mole PL method is first used in constructing gravity -flowed sewer system in Kanuma city, Tochigi prefecture . |
April | Introduction of Espar 21. | |
April | Introduction of CP fracture diagnostic equipment. | |
November | Based on PRISM measurement, DL50 Ace Mole succeeded in piping in curvature R = 200m in Matsuyama city, Ehime prefecture. | |
2002 | April | Employed Type for normal soil (DL-S) using Ace Mole DL method. |
May | Started concrete exploration business by macroscopic ultrasound. | |
May | Registered construction industry (painting constractor). | |
June | Ace Mole DL50 succeeded in piping Φ1,500mm bowlder cobblestone ground in Akeno village, Yamanashi prefecture. | |
July | Established Hokuriku branch. | |
October | Ace Mole DL method is published in the integrated guidelines of "Japan Association for sewer piping technology"(Corporation) . | |
December | Load Espar conducted cavity investigation in Kobe. | |
2003 | February | DL50 Ace Mole succeeded in piping jacking R = 150m curve pipe in rock ground in Hakodate city, Hokkaido . |
April | Established northern Tohoku branch, North Kanto branch, Shizuoka branch, Sanin branch. Renamed Kyushu branch to Southern Kyushu branch. Established new Kyushu branch in Fukuoka . |
|
May | Moved Southern Kyushu branch. | |
May | Succeeded in experimenting using "operator support system (remote Cyber)" to sewer work in the Kumamoto city, Kumamoto prefecture. | |
September | Presented at the Society of Civil Engineers the result of measuring strain by optical fiber (B-OTDR) . | |
2004 | June | Registered in construction industry (Electrical Constractors). |
November | Load Espar conducted information box wiring investigation in Kyushu . | |
November | BeNext (energy-saving air-conditioning control system) became the recommended products at the East NTT Environmental Report. | |
2005 | March | Development and deployment of sewer mounting pipe cavity exploration device. |
March | Established optical fiber sensing technology institute. | |
June | Started applying pipe camera for small diameter (φ30mm apply) long span. | |
October | Abolished the Tsukuba, Kyoto technology center. Established the Technology Division. | |
2006 | April | Established Reverse Ace System Research Association (Rebuilt pipe jacking). |
May | Awarded the Technical Encouraging prize from the Japan Society of Civil Engineers Kansai Branch (New reinforcement and deformation monitoring technology for existing shield tunnels "protecting IT era's aorta the "communication tunnel" ) (B-OTDR)) |
|
June | Development and introduction of simple Espar (Espar EG) for attendance's used. | |
August | Registered in the construction industry (steel structures, pipe construction, earthmoving) . | |
2007 | February | Development and introduction of camera inspection for road drainage pipe (AIPIT) and reparing method (eyeliner DP method). |
February | Reverse ace system succeeded in rebuilt pipe jacking in Mitaka city, Tokyo | |
June | Development and introduction of aramid fiber sheet method to reinforce the weakened aging manhole (AI-MAT) |